REHABILITATION OF SACKETT POINT ROAD OVER QUINNIPIAC RIVER

​

BES is providing inspection services for this complex rehabilitation project. The roadway component of this work is approximately 1650 feet, east to west, and includes performing signal work at the intersection with Universal Drive, as well as adding roadway width and turning lanes. There are both overhead and buried utility relocations required, as well as new storm drainage being installed. The bridge replacement is in full, and is designed to occur in 3 phases over the course of 3 construction seasons. The existing two-span bridge is severely corroded and has reached the end of its service life, and will be replaced by a two-span integral abutment bridge founded on piles that is approximately 164’ long and that meets current geometric, load and service standards. 

​

CLIENT

GM2 Inc.

​

LOCATION

North Haven, CT

​

KEY FEATURES 

  • Complex Construction Schedule

  • Distinct Features including 6 Foot Tidal Swing Bridge, Buried and Overhead Utilities 

​

​

​

bottom of page